Mirkwood
We’ve made some progress on the floor despite everyone being afraid of heights and we’re almost at the halfway point. Our internet and home phone went down, so we’ve had to change to our off grid network. I’m still knitting, crocheting and working on repair stuff. Some days it seems overwhelming.
Blog posted on Saturday May 19th 2018 18:36:08 GMT -07:00
Mirkwood
We have made some progress, but the removal of the floor hasn’t happened as there were more “but first” things to be done.
One of the support beams is in and a wall for the out side access closet. The bathroom is mostly gutted. We’ve had to haul off more garbage because the owner can’t keep up. That really cuts into work progress. A past tenant knocked a hole in the tub and patched it badly. So that will need to be replaced. Can’t say I’m sorry about that, the tub was gross.
One of the support beams is in and a wall for the out side access closet. The bathroom is mostly gutted. We’ve had to haul off more garbage because the owner can’t keep up. That really cuts into work progress. A past tenant knocked a hole in the tub and patched it badly. So that will need to be replaced. Can’t say I’m sorry about that, the tub was gross.
Blog posted on Friday May 4th 2018 12:57:13 GMT -07:00