We have made some progress, but the removal of the floor hasn’t happened as there were more “but first” things to be done.
One of the support beams is in and a wall for the out side access closet. The bathroom is mostly gutted. We’ve had to haul off more garbage because the owner can’t keep up. That really cuts into work progress. A past tenant knocked a hole in the tub and patched it badly. So that will need to be replaced. Can’t say I’m sorry about that, the tub was gross.
One of the support beams is in and a wall for the out side access closet. The bathroom is mostly gutted. We’ve had to haul off more garbage because the owner can’t keep up. That really cuts into work progress. A past tenant knocked a hole in the tub and patched it badly. So that will need to be replaced. Can’t say I’m sorry about that, the tub was gross.